Intangible Assets F20-20b
Name some item excluded from research and development cost.
- Engineering follow-through.
- Quality control and routine testing.
- Troubleshooting.
- Adaptation of an existing capability, to a particular customer’s needs.
- Routine design of tools, jigs, molds and dies.
- Legal work in connection with patent applications.
- Software development costs.